Concrete pads and walkways are easy to miss when homeowners calculate impervious area for a North Carolina permit site plan. A clear drawing should identify each paved surface, its dimensions and its contribution to the property’s total. Whether a particular surface counts, and which threshold applies, must be confirmed with the local stormwater and zoning authority.
What is an impervious area calculation?
An impervious area calculation totals surfaces that prevent or substantially limit water soaking into the ground. Common examples include roof footprints, asphalt driveways, concrete patios, concrete walkways and accessory slabs. Do not confuse this with building coverage: building coverage often focuses on roofed structures, while stormwater review may include unroofed hardscape. The exact definitions are local and sometimes differ between zoning and stormwater ordinances.
Measure each surface separately
Start with a current survey or field-verified dimensions. On a scaled site plan, outline the existing home roof footprint, driveway, parking apron, detached slabs, walkways, and any proposed extension. Assign each an ID such as I-01, I-02 and P-01 for proposed. For rectangular areas, multiply length by width; for irregular areas, divide the shape into rectangles and triangles, then sum the parts. Label dimensions in feet and areas in square feet. Confirm which portion of the parcel lies within the relevant calculation boundary.
Worked example: two concrete areas and a driveway
Assume an existing driveway is 12 ft × 45 ft = 540 sq ft. A rear concrete pad is 16 ft × 20 ft = 320 sq ft. A proposed walkway is 4 ft × 28 ft = 112 sq ft. The combined hardscape in this simplified example is 972 sq ft. On a hypothetical 10,000-sq-ft parcel, these three surfaces alone equal 9.72% of lot area. This is NOT the total property impervious percentage until roofs and all other qualifying surfaces are added. If the walkway is new, the existing subtotal for these three surfaces is 860 sq ft and the proposed subtotal is 972 sq ft, a net increase of 112 sq ft.
How to label the drawing
Show existing and proposed surfaces in different line styles or hatches, provide a north arrow, property lines, setbacks, dimensions, a legend, and an existing/proposed impervious-area table. If a pad is being removed, show demolition separately so the net change is transparent. Keep roof projections and paved surfaces distinct to avoid double counting overlapping areas. Mark drainage flow direction only when supported by measured elevations; do not invent spot grades.
What to verify with the local reviewing office
Check whether gravel, pavers, decks, compacted areas or permeable pavement count; whether calculations use the gross parcel or a regulated drainage area; and whether a threshold triggers a stormwater plan, drainage analysis, or professional design. North Carolina DEQ administers state stormwater programs, but many municipal and county rules also apply. A permit-ready site plan is not automatically a stormwater engineering certification.
Common corrections and a submission checklist
Typical corrections arise from omitted walkways, inconsistent dimensions, missing existing-versus-proposed totals, or figures that disagree with the site plan geometry. Before submission, reconcile every area with the plotted footprint, verify the lot area, check for other impervious surfaces and confirm the authority’s definitions. If the project changes drainage patterns or requires stormwater design, obtain qualified civil engineering input rather than relying on an area table alone.
Official reference and further reading
For the applicable regulatory context, consult North Carolina DEQ Stormwater Program (checked as a source on November 19, 2026). Local permit standards and property-specific conditions may differ. Related reading: site plan requirements and feasibility and a related drawing guide.
Need a drawing prepared? Request a property-specific site plan review from our drafting team. A drawing prepared for submission is not a promise of permit approval or a substitute for a required licensed survey or engineering design.




